4/13/08 - Scheduled Network Maintenance

Collapse
X
 
  • Time
  • Show
Clear All
new posts
  • AndrewT
    Administrator
    • Mar 2004
    • 3655

    #1

    4/13/08 - Scheduled Network Maintenance

    Date: Sunday April 13th 2008 (4/13/2008)
    Start time: 3:00am CDT
    End time: 5:00am CDT
    Devices: fcr01.dal01
    Location: dal01
    Duration: 15 minutes
    Services Effected:
    cpanel56
    cpanel57

    Network Engineers will be performing upgrade maintenance on the router that some of our servers connect through on Sunday April 13th starting at 3:00am CDT. During this time, engineers will be swapping out the existing supervisor engines (SUP720-3BXL) with new Cisco best of breed supervisor engines (VS-S720-10G-3CXL) on FCR01.DAL01. As this router provides direct connectivity to these servers, public internet connectivity will be unavailable at various points during the above maintenance window. Although we expect this upgrade of the supervisor engines to only take approximately 15 minutes, we have scheduled a maintenance window from 3:00am to 5am CDT.
  • AndrewT
    Administrator
    • Mar 2004
    • 3655

    #2
    This maintenance was successfully completed with approximately 10 minutes of total downtime.

    Comment

    Working...