Date: Sunday April 13th 2008 (4/13/2008)
Start time: 3:00am CDT
End time: 5:00am CDT
Devices: fcr01.dal01
Location: dal01
Duration: 15 minutes
Services Effected:
cpanel56
cpanel57
Network Engineers will be performing upgrade maintenance on the router that some of our servers connect through on Sunday April 13th starting at 3:00am CDT. During this time, engineers will be swapping out the existing supervisor engines (SUP720-3BXL) with new Cisco best of breed supervisor engines (VS-S720-10G-3CXL) on FCR01.DAL01. As this router provides direct connectivity to these servers, public internet connectivity will be unavailable at various points during the above maintenance window. Although we expect this upgrade of the supervisor engines to only take approximately 15 minutes, we have scheduled a maintenance window from 3:00am to 5am CDT.
Start time: 3:00am CDT
End time: 5:00am CDT
Devices: fcr01.dal01
Location: dal01
Duration: 15 minutes
Services Effected:
cpanel56
cpanel57
Network Engineers will be performing upgrade maintenance on the router that some of our servers connect through on Sunday April 13th starting at 3:00am CDT. During this time, engineers will be swapping out the existing supervisor engines (SUP720-3BXL) with new Cisco best of breed supervisor engines (VS-S720-10G-3CXL) on FCR01.DAL01. As this router provides direct connectivity to these servers, public internet connectivity will be unavailable at various points during the above maintenance window. Although we expect this upgrade of the supervisor engines to only take approximately 15 minutes, we have scheduled a maintenance window from 3:00am to 5am CDT.
Comment