4/14/08 - Scheduled Network Maintenance

Collapse
X
 
  • Time
  • Show
Clear All
new posts
  • AndrewT
    Administrator
    • Mar 2004
    • 3655

    #1

    4/14/08 - Scheduled Network Maintenance

    Date: Monday April 14th 2008 (4/14/2008)
    Start time: 3:00am CDT
    End time: 5:00am CDT
    Devices: fcr02.dal01
    Location: dal01
    Duration: 15 minutes
    Services Effected:
    cpanel58
    cpanel59
    cpanel60
    cpanel61
    cpanel62
    cpanel63
    cpanel67
    cpanel70
    sa01

    Network Engineers will be performing upgrade maintenance on the router that some of our servers connect through on Monday April 14th starting at 3:00am CDT. During this time, engineers will be swapping out the existing supervisor engines (SUP720-3BXL) with new Cisco best of breed supervisor engines (VS-S720-10G-3CXL) on FCR02.DAL01. As this router provides direct connectivity to our servers, public internet connectivity will be unavailable at various points during the above maintenance window. Although we expect this upgrade of the supervisor engines to only take approximately 15 minutes, we have scheduled a maintenance window from 3:00am to 5am CDT.
  • AndrewT
    Administrator
    • Mar 2004
    • 3655

    #2
    This maintenance was successfully completed with approximately 10 minutes of total downtime.

    Comment

    Working...