Date: Tuesday May 13th 2008 (5/13/2008)
Start time (CST): 0:00am CDT
End time (CST): 6:00am CDT
Duration: 15-30 minutes
Servers Effected:
cpanel52
A maintenance window is scheduled from 00:00 to 06:00 CDT to upgrade the router that cpanel52 is connected to. Actual downtime is expected to be 15-30 minutes.
Start time (CST): 0:00am CDT
End time (CST): 6:00am CDT
Duration: 15-30 minutes
Servers Effected:
cpanel52
A maintenance window is scheduled from 00:00 to 06:00 CDT to upgrade the router that cpanel52 is connected to. Actual downtime is expected to be 15-30 minutes.
Comment