Date: Saturday May 17th 2008 (5/17/2008)
Start time (CST): 2:00am CDT
End time (CST): 5:00am CDT
Duration: 15 minutes
Servers Effected:
cpanel64
cpanel65
cpanel66
cpanel68
cpanel69
Network engineers will be performing an IOS/firmware upgrade on the router that these servers are connected to. Although they expect this upgrade of the supervisor engines to only take approximately 15 minutes, they have scheduled a maintenance window from 2:00am to 5am CDT.
Start time (CST): 2:00am CDT
End time (CST): 5:00am CDT
Duration: 15 minutes
Servers Effected:
cpanel64
cpanel65
cpanel66
cpanel68
cpanel69
Network engineers will be performing an IOS/firmware upgrade on the router that these servers are connected to. Although they expect this upgrade of the supervisor engines to only take approximately 15 minutes, they have scheduled a maintenance window from 2:00am to 5am CDT.